March 21

How Long Does It Take To Renovate An Apartment

0  comments

Apartment renovation can be a humongous project to undertake all by yourself. But, the question is - how long does it take to renovate an apartment

When it comes to renovating an entire apartment, you need to think about the materials and their sources, labor costs, design and décor, and so much more. 

Ideally, it can take a few months to renovate your old apartment completely. But, to know more about the timeline, read on!

Apartment Renovation Timeline

1. Pre-Construction Phase 

The entire pre-construction phase usually lasts for 2 to 3 months. Although people focus on the construction phase while renovating their apartments, it’s impossible to kickstart the actual renovation without the pre-construction work. 

Before you start tearing down the old construction of the apartment, you need to work to get the correct legal permits and approvals from the local authorities. You don’t want any hiccups while you’re halfway through the construction work. So, it’s always better to deal with all the paperwork before commencing the apartment renovation. 

Plus, you might need to hire a professional architect if you want major alterations in the gas or plumbing lines. You’ll also need to hire expert electricians to do all the electric work in the apartment during renovation. Moreover, it’s best to order the materials beforehand after consulting with your contractor so that the construction can go on smoothly. 

2. Construction Phase 

The central part of your renovation timeline will be dedicated to the construction phase. Everything comes under the construction phase, from demolition to plumbing and electrical line alterations. Hence, depending on the degree of renovation, the construction time can range between 2 to 3 months. 

The demolition might take 2 to 5 days while rerouting the electrical and plumbing lines usually takes 2 to 4 days. Plus, if you want a new floor installation, that’ll require 5 to 12 days. The installation of other furniture and accessories like lighting, cabinets, bathroom, and kitchen equipment can require an additional 5 to 20 days. 

Moreover, once you’re done with the electrical and plumbing work, you’ll need to have 1 to 4 days for the city inspector to check the entire plumbing and electrical systems of the apartment for safety purposes. 

3. Post-Construction Phase 

Finally, the post-construction phase usually takes a few days to a week, where you tick off all the items on your apartment renovation list and make the final payments to the contractor. It’s the final step before you move into your newly renovated apartment. 

Final Thoughts

Renovating your apartment from scratch is a mammoth task, and you need to follow a strict timeline to get the project done in time and within the proper budget. 

After going through my article, I hope you have a better idea regarding the renovation timeline. I recommend that you discuss every minute detail of the renovation project with a professional contractor and architect before developing a custom timeline that suits your requirements. 

Until next time! 


Tags


You may also like

How Hot Does a Pressure Cooker Get?

How Hot Does a Pressure Cooker Get?
Leave a Reply

Your email address will not be published. Required fields are marked

{"email":"Email address invalid","url":"Website address invalid","required":"Required field missing"}