How Long Does It Take To Add A Room To A House

0  comments

Adding an extra room allows you to work with additional space if you don’t want to buy a new house. Plus, remodeling other rooms refreshes your entire space. 

So, how long does it take to add a room to a house? The answer will depend on a lot of things that you need to consider. Kitchen or bathroom additions take the longest due to more fixtures and electric lines, but that may not be the case with bedrooms. Let’s discuss further.

1. How Much Time Does It Approximately Take?

If you’re planning to add a couple of hundred square feet over a crawl space or flare grade, its foundation takes a few days to build, and its walls will go up in a day or two. 

Its exterior structure must be sheathed once the walls are completed. Generally, tyvek is applied on the following day, and the exterior siding is completed the next day. At the same time, the roof takes an extra day to complete. So, it takes approximately 4-5 days to complete the process. 

Aside from that, if it’s not the kitchen or bathroom, or if no extensive wiring or plumbing is needed, completing hanging drywall takes a week or so. You need to work separately on baseboards and molding before painting in bathrooms or kitchens. And other finishes like lighting, cabinetry, outlets, lighting, or other items are included, which takes time. 

Overall, if you’re working on a bathroom or kitchen, it takes approximately 3-4 months, while it's half the time for other rooms. But the longer you take to plan and gather materials, the more prepared you are and the faster the construction will be. 

Remember that everything ultimately depends on the kind of addition you’ve planned and the vastness of the project.

2. How Should I Deal With The Contractor?

Before initiating any talks with the contractor, it's crucial to consider the common delays up front and develop a positive attitude for dealing with them effectively. By remaining prepared, you can deal with any potential delays and cut down the additional time. 

Also, it's crucial to develop a good working relationship with the contractor and establish an open communication with him. This will also help you get a realistic expectation of the completion of your project. 

Ask your contractor to provide a list of materials required and stay ready to complete adding a room without any delays. 

Final Words

Budget and scheduling are critical in room additions, and it’s imminent to obtain a dependable and professional builder. A project, be it room addition, renovation, or any other should be planned well and an action plan should be developed to deal with it. In this way, you can complete your project in time.

I hope I have answered your question. Goodbye. and take care!


Tags


You may also like

How Hot Does a Pressure Cooker Get?

How Hot Does a Pressure Cooker Get?
Leave a Reply

Your email address will not be published. Required fields are marked

{"email":"Email address invalid","url":"Website address invalid","required":"Required field missing"}